Northern Virginia

Mon–Sat, 8am–6pm

Compare

Under-joist vs between-joist deck drainage

Under-deck drainage either hangs below the joists or tucks between them, under the boards. The question that decides it for most homeowners: do your deck boards have to come up?

Side by side

FeatureUnder the joists (ours)Between or over the joists
Where it goesBelow the joists, with the deck boards in placeBetween or over the joists, under the deck boards
MaterialAluminum with a baked-on finishVaries. Aluminum channels or a membrane, depending on the system.
Rust and corrosionAluminum doesn't rustDepends on the material
Install on an existing deckYes, from below. Most decks take 1–3 days.Yes, with the deck boards lifted
Deck boards removed?NoYes, then put back
Best time to installExisting decks, or new ones once the framing and decking are doneDuring a new build, before the boards go down
Headroom usedTypically 3–5 in. below the joistsThe drainage sits between the joists, not below them
Cleaning and accessHose rinse; panels unclip for a deeper cleanGutters and downspouts still need cleaning
Lighting optionsFlush star lights, plus mounts for fans, surface lights and heatersA finished ceiling below can take recessed lights, fans and speakers
Typical installed costPriced per deck from its size and photos, labor and materials included.Varies. On an existing deck, the job includes lifting and relaying the boards.

Other systems differ by maker and installer, so where we say “varies”, ask for the specifics. Get a quote for your deck

When a between-joist system is the better choice

  • You're building a new deck

    The joists are open before the boards go down, which is when these systems are meant to go in. On a new build, downspouts can be hidden inside columns.

  • Your deck boards are coming off anyway

    If you're replacing the decking, the joists will be open regardless. Some systems also cover the tops of the joists with an ice-and-water shield while they're exposed.

  • You want the drainage hidden and recessed lights

    The drainage sits up between the joists, hidden by a finished ceiling below. That ceiling can take recessed lights, fans and speakers.

How to choose

  1. Ask whether the boards are coming off anyway. If you're building or re-decking, look at a between-joist system. If not, an under-joist ceiling leaves them alone.

  2. Measure from the patio to the bottom of the joists, then ask each installer how much of that their system takes.

  3. On a new build, decide before the decking goes down, and talk to your builder early.

  4. Ask how you would reach the gutter, downspout and drainage later.

Questions about under-joist and between-joist systems

All questions

Do you have to remove my deck boards?

No. On a deck that's already built, we do all of the work from underneath, below your joists. Nothing on the deck surface changes. Systems that go between or over the joists sit under the boards, so on an existing deck the boards come off and go back on.

Which is better for a new deck?

Either can work. A between-joist system goes in while the joists are open, before the decking. Ours goes in after: we coordinate with your builder and install once the framing and decking are done.

Which uses less headroom?

A between-joist system puts the drainage up between the joists rather than below them. Ours sits below them, typically 3–5 in. below the joists.

Can I get recessed lights?

A between-joist system with a finished ceiling below can take recessed lights, fans and speakers. Ours takes flush star lights set into the panels, plus mounts for fans, surface lights and heaters.

Get started

Get a firm price within one business day.

No account and no sales call needed. Photos usually let us quote without a site visit.

CallGet a quote